HDD Machine Rental (Horizontal Directional Drilling)

Rent horizontal directional drilling (HDD) rigs from 10 to 80 t pullback, with rods and reamers, for power, telecom, road and utility crossings across Saudi Arabia. Supplied from RYM and partner fleets — request a quote.

What it is

Horizontal directional drilling installs pipe and cable ducts under roads, rail, wadis and existing services without an open trench. A pilot bore is steered from an entry point to an exit point, reamed out to size, and the product pipe is pulled back through.

Rigs are sized by pullback — the force they can pull the pipe back with. Longer crossings and larger pipe need more of it.

Typical sizes

Tell us the bore length, pipe diameter and ground, and we match the rig.

Compact rigs, 10–20 t pullback

Short urban crossings, fibre and telecom ducts, house connections.

Mid-size rigs, 20–50 t pullback

Road and utility crossings, power cable ducts, bundled conduits.

Large rigs, 50–80 t pullback

Longer, larger-diameter crossings for water, sewer and gas lines.

Rods, reamers and mud systems

Drill rods, back-reamers and drilling-fluid mixing matched to the bore.

Typical jobs

SEC power cable crossings

Cable ducts under roads and plots for SEC networks.

Telecom and fibre

Fibre and telecom ducts without cutting the street.

Road and rail crossings

Crossing under live roads and rail without closures.

Water and sewer lines

Pipe installation under wadis and existing services.

Can I rent an HDD rig with an operator?

Yes — with or without an operator. Steering a bore needs a driller and a locator (tracking) operator, so HDD rigs are usually hired with a crew. Tell us which you need in the quote request and we confirm it in the quote.

What is the minimum rental period?

Our minimum hire is one week. Most of these jobs run monthly or for the length of the project.

How do delivery and mobilisation work?

We arrange transport to your site anywhere in the Kingdom. The rig, rod trailer and mud system travel on separate trucks. Mobilisation time and cost depend on the machine and the distance, and are set out in your quote.

Can the machine come with third-party inspection or TÜV certification?

Yes, on request. If your client or main contractor requires third-party inspection (TÜV or similar) or Aramco-approved paperwork, say so in the request and we arrange it before mobilisation.