Dynapac CC2200 · Hamm HD 14 class: Asphalt paving trains, Road resurfacing, Car parks and yards, Thin granular layers, Finishing passes
Dynapac CA2500D · Bomag BW 213 · CAT CS56B: Earthworks lifts, Subbase and subgrade, Backfill compaction, Site preparation, Embankments
Bomag BW 226 DH-5 class: Deep-lift compaction, Rockfill and heavy subbase, Dams and reservoirs, Airport and port platforms, High-spec density targets
Compare key specifications across the classes on the platform.
| Tandem Asphalt | Single-Drum Soil | Heavy 20 t+ | |
|---|---|---|---|
| Drum Width | ~1,300–1,600 mm | 2,130 mm | ~2,130 mm |
| Target Layer | Asphalt | Soil / subbase | Deep lifts / rockfill |
| Drum Type | 2 × smooth | Smooth or padfoot | Smooth or padfoot |
| Typical Lift | 40 – 100 mm | 200 – 300 mm | 300 – 500 mm |
| Transport | Flatbed | Flatbed | Flatbed / lowbed |
Rollers on the platform serve roads, earthworks, platforms and utilities across the Kingdom
Subgrade, subbase and asphalt layers each take their own roller class — from soil drums to tandem finishing.
Building pads, tank farms and laydown yards compacted to spec before anything is built on top.
Utility backfill compacted in lifts so roads don't settle — the follow-on machine behind every trenching crew.
Heavy compactors on deep lifts and rockfill where density targets are highest and layers thickest.
Runway, apron and quay platforms built in controlled lifts with documented compaction.
Mass grading across NEOM-scale sites runs roller fleets behind the excavation spread, shift after shift.
Drums, vibration systems, scrapers and water systems are checked and the machine is tested before it leaves the yard.
Rollers move on a standard flatbed and reach most Saudi cities quickly — matched to your paving or earthworks schedule.
Tell us the material and lift thickness and we'll match drum type and weight class to your spec.
Support in Arabic and English over WhatsApp throughout your rental.
Single-drum (padfoot or smooth) rollers compact soil, sand and subbase in deep lifts — they're the earthworks machine. Tandem rollers with two smooth drums finish asphalt and thin granular layers. On a road job you typically need both, at different stages.
It depends on lift thickness, material and required density. As a guide, a 2,130 mm single-drum roller working 200–300 mm lifts covers several thousand square metres per shift; compaction trials on your material set the pass count. Your site engineer's spec governs — we can connect you with owners whose machines carry compaction meters.
Many listings offer an operator as an option — shown on each machine's page and confirmed in your quote. Asphalt finishing in particular benefits from an experienced roller operator; dry hire is available where you have your own.
Delivery is arranged to your site anywhere in Saudi Arabia and quoted separately by road distance — rollers move on a standard flatbed. The transport cost appears in your quote before you commit.