How oversized generators waste fuel and damage engines on Saudi construction sites — and the simple fix most contractors miss.
The Most Underestimated Decision on Site
Ask a project manager about their crane strategy and you'll get a detailed answer. Ask about generator sizing and you'll usually get a shrug and "the electrician handles it."
This casual approach costs Saudi construction projects millions of riyals annually in fuel waste, equipment damage, and downtime.
The Core Problem: Oversizing
The instinct is to go big. A site that needs 500 kVA of peak capacity gets a 1,000 kVA generator "just to be safe." This creates a problem called light loading.
Diesel generators running below 30% of their rated capacity suffer from:
Wet stacking — unburned fuel accumulates in the exhaust system, causing carbon buildup and eventual engine damage Fuel waste — a generator at 25% load burns nearly as much fuel as one at 50% load Shortened maintenance intervals — manufacturers recommend more frequent servicing for chronically underloaded machines
How to Size Correctly
Start with your actual load profile, not your peak theoretical demand.
Welders draw heavy current for seconds, not hours Tower crane motors have a high starting current but modest running load Temporary site offices need relatively little power
A load study over 48 hours of typical operations gives you the data you need. Most generators should run at 60-80% of rated capacity during normal operations.
The Altitude and Temperature Factor
Generator ratings are given at sea level and 25°C. In Riyadh (elevation 612m, summer temperature 50°C), derate by 12-15%. A generator rated at 500 kVA in standard conditions delivers roughly 425-440 kVA in Riyadh summer.
Jeddah's sea-level location means less altitude derating, but humidity affects air density too.
Fuel Quality
Saudi diesel is generally good, but construction sites in remote areas sometimes receive fuel that's been stored in less-than-ideal conditions. Contaminated fuel is the single most common cause of generator failure on remote Saudi sites.
Install fuel-water separators and change fuel filters at half the manufacturer's interval on remote projects.
The Bottom Line
Right-sizing your generators saves fuel, extends equipment life, and reduces your carbon footprint. It's one of the easiest wins available to any Saudi construction project.